Enercon

Image 1

The MV “Beluga Efficiency“ is loading rotor blades.


Image 2

The cargo is stowed in the hatches and on deck.


Image 3

All in all 148 cargo elements were shipped from Emden to Toronto.


Image 4

During the project the vessel was loaded and discharged six times.


Image 5

Together, the board cranes can lift up to 240 tons.


Image 6

All in all six shipments were necessary.


 

print | recommend 
http://www.beluga-group.com/en/references/wind-energy/enercon/pictures/
en
| RSS-Feed
 
content.html