The loading of the 360 tower sections.
Each tower sections is up to 29 metres long and weighs more than 50 tons.
Only the lashing of the 26 frames, which held the second layer of the tower sections, took a whole day to fix.
The space-saving transport reduced the number of shipments.
This innovative way of stowage saves time and reduces costs.
An experienced crew handles the loading.
The frames can be simply dismantled and easily used again at the next opportunity.
The stable frameworks may even become part of the standard equipment of the Beluga fleet.
Here you can download reference pictures