Sevenstar Yacht Transport

Image 1

The yachts are being put into especially formed frameworks and there fixed.


Image 2

A Beluga employee lashes the valuable cargo.


Image 3

Loading at night needs special care.

Image 4

The loading was finished after three days. A dozen ships were transported safely from Tortola to Mallorca within this project.

Image 5

The MV “Beluga Recognition” sets sail to Palma de Mallorca.

Image 6

View from the bridge over the fully loaded MV “Beluga Recognition”.

 

print | recommend 
http://www.beluga-group.com/en/references/vesselshulls/sevenstar-yacht-transport/pictures/
en
| RSS-Feed
 
content.html