Votorantim Cimentos

Image 1

Loading of a tube with onboard cranes of MV “Beluga Mumbai”.

Image 7

Loading of a tube with onboard cranes of MV “Beluga Mumbai”.

Image 8

The big tubes each weighed 189 tons.

Image 2

The transport on MV “Beluga Mumbai” was made from China to Brazil.

Image 3

The transport on MV “Beluga Mumbai” was made from China to Brazil.

Image 4

The two tubes were loaded side by side lengthwise into the extra large box-shaped holds of the vessel underneath the deck.

Image 5

The cement mill parts were ensured with wire and lashing ropes in the freight hold of the vessel.

Image 6

At the project’s end, Beluga again had realized again a flexible, tailored as well as time- and cost- efficient transportation.

 

print | recommend 
http://www.beluga-group.com/en/references/project/votorantim-cimentos/pictures/
en
| RSS-Feed
 
content.html