The MV “Beluga Intonation“ while berthing in the harbour of Ortona in Italy.
Preparing the cargo for lifting onto the multipurpose heavy-lift project carrier.
The Beluga team used the outstanding capabilities of the vessel and lifted the reactors by employing only one crane in each case.
The cargo to be loaded in the Italian port of Ortona consisted of two reactors, both weighing 326 tons and measuring 36.5 x 8 x 11.5 metres.
Except the saddles the cargo was completely wrapped in plastic for protection.
Here you can download reference pictures