Petronas (Züst & Bachmeier as charterer)

Image 1

MV "Beluga Intonation“ is discharging the cargo of the alongside moored MV “Beluga Constitution”.

Image 2

The cranes of MV “Beluga Intonation” have to lift every single piece from the MV “Beluga Constitution” at portside to the barge at starboard.

Image 3

The cranes of MV “Beluga Intonation” have to lift every single piece from the MV “Beluga Constitution” at portside to the barge at starboard.

Image 4

Transferring the cargo from side to side required precise ballasting and good command of the cranes.

Image 5

Transferring the cargo from side to side required precise ballasting and good command of the cranes.

Image 6

The Beluga-Team supervised the precise execution of all operations.

Image 7

The Beluga-Team supervised the precise execution of all operations.

 