NATCO

Image 1

The board cranes of MV “Beluga Bremen” loading the modules in the port of Map Ta Phut (Thailand).


Image 2

The cranes of the brand new P2-series of Beluga feature a lifting capacity of up to 1400 tons.


Image 3

The loading of six modules was realized from April 4 to 5, 2010.


Image 4

The opened cargo hold of the vessel at night.


Image 5

The project was controlled from the bridge of the vessel around the clock.


Image 6

MV “Beluga Bremen” after leaving the port in the Gulf of Thailand.


Image 7

The voyage of MV “Beluga Bremen” from Thailand to the port of discharge in Bandar Abbas (Iran) was accomplished in two weeks.


 

print | recommend 
http://www.beluga-group.com/en/references/oil-gas/natco/pictures/
en
| RSS-Feed
 
content.html