Picture Service Oil & Gas

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "picture safe below".

Oil & Gas: Statoil


A cable reel is loaded in Karlundborg.


On her way to the port of destination: MV “Beluga Emotion“ with seven RTGs on deck.


The MV “Beluga Recognition“ before passing the North Sea on the way to Florø.


The MV “Beluga Recognition“ passing the North Sea on the way to Florø.


The MV “Beluga Recognition“ discharging in Florø.

A big reel being discharged in Florø.

Oil & Gas: Transcar

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The MV “Beluga Intonation“ while berthing in the harbour of Ortona in Italy.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

Preparing the cargo for lifting onto the multipurpose heavy-lift project carrier.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The Beluga team used the outstanding capabilities of the vessel and lifted the reactors by employing only one crane in each case.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The cargo to be loaded in the Italian port of Ortona consisted of two reactors, both weighing 326 tons and measuring 36.5 x 8 x 11.5 metres.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

Except the saddles the cargo was completely wrapped in plastic for protection.


Oil & Gas: Petronas

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

MV "Beluga Intonation“ is discharging the cargo of the alongside moored MV “Beluga Constitution”.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The cranes of MV “Beluga Intonation” have to lift every single piece from the MV “Beluga Constitution” at portside to the barge at starboard.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The cranes of MV “Beluga Intonation” have to lift every single piece from the MV “Beluga Constitution” at portside to the barge at starboard.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

Transferring the cargo from side to side required precise ballasting and good command of the cranes.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

Transferring the cargo from side to side required precise ballasting and good command of the cranes.

Please click on the photo to get the pop-up-version and then use your right mouse button with picture safe below"save target as".

The Beluga-Team supervised the precise execution of all operations.

Please click on the photo to get the pop-up-version and then use your right mouse button with picture safe below"save target as".

The Beluga-Team supervised the precise execution of all operations.

Oil & Gas: Saipem

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

MV “Beluga Resolution” at sea.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

MV “Beluga Resolution” at sea.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

From September 28th to October 11th 2008, MV “Beluga Resolution” transported an urgently needed offshore module to Gulf of Guinea in West Africa.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

From September 28th to October 11th 2008, MV “Beluga Resolution” transported an urgently needed offshore module to Gulf of Guinea in West Africa.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

From September 28th to October 11th 2008, MV “Beluga Resolution” transported an urgently needed offshore module to Gulf of Guinea in West Africa.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The loading onto the multipurpose heavy-lift project carrier took place in the port of Arbatax/Sardinia.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The loading onto the multipurpose heavy-lift project carrier took place in the port of Arbatax/Sardinia.




Oil & Gas: Hyundai

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

A demethanizer unit with a length of 53.38 metres is being delivered.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

At this moment, nearly 300 tons are hanging on starboard.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The MV “Beluga Constellation“ is lifting a demethanizer unit on board.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The MV “Beluga Constellation“ is lifting a demethanizer unit on board.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The second demethanizer unit is being lifted on board safely.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The experienced crew handles loading and lashing of the valuable cargo without any problems.

Oil & Gas: Deugro/Linde

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The top part of the C3 splitter is being loaded on the tank top of the MV “Beluga Intonation”.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

Under the surveillance by the team of Beluga: The loading of the bottom part of the C3 splitter.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

Just a few months ago, the MV “Beluga Intonation” has been cut in the middle, lengthened and provided with stronger board cranes.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The board cranes of the multipurpose heavy-lift project carrier are lifting the bottom part of the C3-splitter onto the weather deck. The unit weighs 340 tons and is 63 meters long.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

On the pier ready for loading: The Demethanizer, measuring 66 meters and weighing 340 tons.

Oil & Gas: Idesa

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The defractionator with a length of 66 metres is being loaded.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The defractionator with a length of 66 metres is being loaded.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The MV “Beluga Intonation” is lifting a defractionator on board with the help of his own cranes.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

At this moment, nearly 300 tons are hanging on starboard.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "save target as".

The experts at Beluga Group ensure that the valuable project cargo gets to its destination safely.

Oil & Gas: Technip

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with

One of both reels is unlashed.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with

The MV “Beluga Revolution“ discharging a reel.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with

One of the two reels with a diameter of more than nine metres and a weight of 205 tons.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with

The on-board cranes at work.

Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with

The multipurpose heavy-lift project carrier discharged the reels directly to the installation vessel “Venturer”.

Oil & Gas: NATCO

The board cranes of MV “Beluga Bremen” loading the modules in the port of Map Ta Phut (Thailand).

The cranes of the brand new P2-series of Beluga feature a lifting capacity of up to 1400 tons.

The loading of six modules was realized from April 4 to 5, 2010.

The opened cargo hold of the vessel at night.

The project was controlled from the bridge of the vessel around the clock.

MV “Beluga Bremen” after leaving the port in the Gulf of Thailand.

The voyage of MV “Beluga Bremen” from Thailand to the port of discharge in Bandar Abbas (Iran) was accomplished in two weeks.

Oil & Gas: Essar

The onboard cranes of MV "Beluga Shanghai" loading one of the two coke drums at Ningbo/China.

The two coke drums challenged the creativity and the skills of the team on site.

The cranes had to use their full power to move the freight weighing 430 tons.

The Transport Engineers of Beluga took advantage of the specific shape of the two coke drums to stow their conical tops nested.


The transport of the two 40-meter coke drums was made from Ningbo, China, to Vadinar, India, in September 2010.


 

print | recommend 
http://www.beluga-group.com/en/press/photo-gallery/oil-gas/
en
| RSS-Feed
 
content.html