The MV “Beluga Efficiency“ is loading rotor blades.
The cargo is stowed in the hatches and on deck.
All in all 148 cargo elements were shipped from Emden to Toronto.
During the project the vessel was loaded and discharged six times.
Together, the board cranes can lift up to 240 tons.
All in all six shipments were necessary.